Key Points

Where a fixed bid shows one total, Persson Construction gives homeowners the actual number each subcontractor sends, adds its markup, and shows every bill it receives.
The price is built in steps: budget ranges by trade after a home visit, a paid planning phase, 1 to 3 Trade Days with the subcontractors, and then a construction proposal the homeowner reviews and signs.
During the work, the Buildertrend portal shows the schedule, the budget, and daily logs, and anything outside the contracted price comes as a change order with photos and the reason, approved before that extra work starts.

Are you comparing a builder who hands you one number with a builder who shows you the numbers behind it?

You’ll learn:

  • What cost plus pricing means
  • How your price gets built, step by step
  • What you can see while the work is going on
  • What happens when a wall opens up and something is wrong behind it
  • What cost plus shows you that a fixed bid doesn’t
  • Whether cost plus is the right fit for your remodel

What Is Cost Plus Pricing in a Remodel?

We are a cost plus remodeler. That means we give you the actual numbers we receive directly from the subcontractors (the trades), and we add our markup to them.

Bathroom vanity with tall linen cabinet, stained wood drawers, chrome pulls, framed mirrors, and marble-look tile

Even one bathroom has several trades behind it, from plumbing and lighting to flooring and cabinets. We show you every bill we receive, so you see exactly what each trade did and what it cost.


How Do You Get a Real Price With Cost Plus?

Our tagline is “Plan, Price, Build.” The more planning you can do before the first swing of the hammer, the better the job runs. The planning and the pricing come first, in these 4 steps, and then we build.

  • We start with a phone call and a visit to your home. After the visit, we give you budget ranges by trade, from demolition to cabinets, countertops, lighting, plumbing, and flooring, based on our own estimating experience. Those ranges are a ballpark, not the final price.
  • If you want to go further, the next step is a Project Development Agreement, or PDA. It’s a paid planning phase, so we can take the time to plan your project to fit your budget. While we plan, we keep the base job separate from any upgrades.
  • After the PDA is signed, we schedule Trade Days. Depending on the size and scope of your project, we hold 1 to 3 of them. The trades walk through your project with us, and then they price the work.
  • Once the trades send their quotes, we add our own time and the materials and put it all into one construction proposal for you to review. If you like it, you sign it and we get into scheduling.

The construction proposal spells out each allowance (a set dollar amount for something you haven’t picked yet) and each alternate (an option you could pick instead). You make your final choices before construction begins. You can read more about the Persson Construction process.


What Can You See While the Work Is Going On?

Once you sign with us, you get your own portal in Buildertrend, the project management software we use. It’s where you follow the whole job. Everyone on our team who worked on your project that day adds a daily log, with a photo of the work they finished at the end of the day.

Our project manager updates the budget, the schedule, the selections, and any change orders as things change, and keeps the next 2 weeks of the schedule as up to date as possible. You sign contracts, approvals, and change orders online, and you can check the portal from anywhere.

One homeowner we talked with lives in California, and she loved the idea of checking on her project from there. If you want to know more about staying informed, read how you stay in the loop during your remodel.


What Happens When a Wall Opens Up and Something Is Wrong?

In an older home, the one thing we can’t price ahead of time is what’s inside the walls. You might open a wall and find electrical that needs replacing. We plan as much as we can first, and we tell you that it can happen before we start.

When something turns up that is outside the contracted price, we write a detailed change order. It has photos of what’s happening and the reason we need it, and the price comes straight from the trade that does that part of the work. You approve it before we begin any additional labor. The FTC’s guide to hiring a contractor also notes that a change order could affect the project’s cost and schedule.


What Do You See With Cost Plus That a Fixed Bid Doesn’t Show?

Say you’re comparing a fixed bid with a cost plus price. A fixed bid gives you one number for the agreed work. With cost plus, you see what goes into your price, trade by trade and bill by bill, and you approve any change order before that work is done.

Every job is different, so it’s hard to compare the price of one remodel with another, apples to apples. As a starting point, our bathroom remodels start at $45,000, kitchen remodels at $60,000, home additions at $250,000, and whole-home remodels at $350,000.


Is Cost Plus the Right Way to Price Your Remodel?

Cost plus fits if you want to see where your money goes. The homeowners we work best with care most about their time and an easy process. Our goal isn’t to be the lowest number you get. We want to be your advocate: we work with the trades to get the best price, quality, and scheduling for you, and everyone on our team is working for you.

We work within about 30 miles of our office in Greenland, NH, including Portsmouth, Rye, and North Hampton. See Inside Your Remodel for how a project runs, and our remodeling in Portsmouth, NH page for how we work in your area.


Ready to See the Numbers Behind Your Remodel With Persson Construction?

If cost plus sounds like how you’d want your remodel priced, fill out our contact form or give us a call. We’ll talk through your project, and you can ask us anything about how the numbers work.

Frequently Asked Questions

How much does a remodel with Persson Construction start at?

A bathroom remodel with us starts at $45,000 and a kitchen remodel at $60,000, while home additions start at $250,000 and whole-home remodels at $350,000. Your scope and the trades' quotes decide where your project lands from there.

Will I know what's included before I commit?

You'll review a detailed construction proposal, and you sign it only if you like it. We give you budget ranges by trade first, the subcontractors look over your project on Trade Days and send their quotes, and we put them together for you. The one thing the proposal can't price ahead of time is what's behind an older wall. If something turns up there, it comes to you as a change order, and you approve it before that work begins.

What can I see in my Buildertrend portal?

Your Buildertrend portal shows the schedule, the budget, and daily logs with a photo of each day's work, and you can sign approvals and change orders there. You get it once you sign with us, and you can check it from anywhere.